Tarbela Dam Constructionclick on the link to watchTarbela Dam Construction Plaining & AweSomE Dam View's |
The project is located at a narrow spot in the Indus River valley, at Tarbela in Haripur, shortly located at the point from where the District Swabi starts. Here the river formerly split around a large island close to the left bank. The main dam wall, built of earth and rock fill, stretches 2,743 metres (8,999 ft) from the island to river right, standing 148 metres (486 ft) high. A pair of concrete auxiliary dams spans the river from the island to river left. The spillways, located on the auxiliary dams, in turn consist of two parts. The main spillway has a discharge capacity of 18,406 cubic metres per second (650,000 cu ft/s) and the auxiliary spillway, 24,070 cubic metres per second (850,000 cu ft/s). The outlet works are a group of four tunnels that have been cut through the valley wall at river right, for uses of hydropower generation and flow control. These tunnels were originally used to divert the Indus River while the dam was being constructed. A hydroelectric power plant on the right side of the main dam houses 14 generators fed with water from outlet tunnels 1, 2, and 3.
Tarbela Dam Spillways
Spillways
Service spillway
Gates 7(50 feet wide x 61 feet high)
Discharge 650,000 cusec
Auxiliary Spillways
Gates 9(50 feet wide x 61 feet high)
Discharge 850,000 cusec
Friday, 11 April 2014
Subscribe to:
Posts (Atom)